BACK
Cases
LIST

General control valve performance table

Date:2021-01-05 Visits:1048
UserUnit ParametersValve SpecificationsTimeQuantity
 Green hills of indonesia
6'' 300lb WCB2020/7/292
Dongfang Electric Group Dongfang Steam Turbine Co., Ltd.Guangxi Chiji Iron and Steel 2X100MW2'' 300lb WCB 3''300lb WCB2020/7/2812
Inner Mongolia Huineng Coal Chemical Co., Ltd.Coal-to-natural gas project2'' 600lb F222020/7/172
Shanghai Fengruo Mechanical and Electrical Equipment Engineering Co., Ltd.Waste heat boiler3'' 600lb WCB2020/7/161
Nanjing Steam Turbine Motor Group Taixing Ningxing Machinery Co., Ltd.2X350MW thermal power generation in Morowali Industrial Park, Indonesia4'' 900LB WCB 6'' 600LB WCB 8'' 300LB WCB 6'' 900LB WCB2020/7/914
Shanghai Electric Power Station Equipment Co., Ltd.Indonesia Huaxin Nickel Industry 1X350MW Unit Deaerator Domestic Control Valve6'' 300LB WCB2020/7/72
Inner Mongolia Huineng Coal Chemical Co., Ltd.Coal-to-natural gas project6'' 150LB WCB2020/7/66
Zhejiang Zheneng Jiaxing Power Generation Co., Ltd.2X300MW6'' 600LB WCB2020/6/282
Shanghai Electric Power Station Equipment Co., Ltd.Indonesia Mirawu 2X225MW unit deaerator6'' 300lb WCB2020/6/241
 Jiangsu Nantong Power Generation Co., Ltd.(1000MW unit) #1 unit condenser jet vacuum system modification3'' 300lb WCB 2'' 300LB WCB 1.5'' 300LB WCB2020/6/183
Hangzhou Huadian Xiasha Thermal Power Co., Ltd.2x200MW4'' 300lb WCB2020/6/101
Qingdao Jieneng Material Trading Co., Ltd.Dongguan Xindongyuan Environmental Protection General Contractor2'' 150LB WCB2020/5/294
Shanghai Fengxiang Mechanical and Electrical Equipment Co., Ltd.Newly built bathroom pipeline pressure adjustment2'' 150LB WCB2020/5/282
Inner Mongolia Huineng Coal Chemical Co., Ltd.Coal-to-natural gas project2'' 300LB CF82020/5/221
Institute of Engineering Thermophysics, Chinese Academy of SciencesEnergy storage2'' 600LB WCB 2'' 2500LB F222020/5/193
Qingdao Jieneng Material Trading Co., Ltd.Shandong Yankuang International Coking Co., Ltd.DN80 PN1.6 WCB2020/5/116
Ningxia Yuchangrong Trading Co., Ltd.In-plant engineering of Lingwu company's central heating project to Yinchuan City4'' 150LB WCB2020/5/93
Inner Mongolia Huineng Coal Chemical Co., Ltd.Coal-to-natural gas project1.5'' 600lb WCB 8'' 600lb CF8M2020/5/64
Nantong Meiya Thermal Power Co., Ltd.50MW6'' 300LB WCB2020/4/231
Shanghai Electric Power Station Equipment Co., Ltd.Indonesia Mirawu 2X225MW unit deaerator6'' 300lb WCB2020/4/201
Zhejiang Zheneng Jiaxing Power Generation Co., Ltd.2X300MW6'' 600LB WCB2020/4/202
Guangdong Shaoguan Yuejiang Power Generation Co., Ltd.2×300MW3'' 4500lb F912020/4/161
Ordos City Mengtai Thermal Power Co., Ltd.2×300MW6'' 600LB WCB 4'' 600LB WCB2020/4/24
Nantong Meiya Thermal Power Co., Ltd.50MW5'' 150lb WCB2020/4/21
Hangzhou Hangguo Industrial Boiler Co., Ltd.Chayouqianqi Yuxing Carbon Co., Ltd. Technical Renovation and Expansion Ferroalloy Submerged Arc Furnace Tail Gas Utilization Project2'' 1500lb WCB 2'' 1500LB A105 0.75'' 1500LB A1052020/4/17
Shanghai Dingxin Investment (Group) Co., Ltd. Green hills of indonesia4'' 1500LB WCB 3'' 1500LB WCB2020/3/274
Jiangsu Zhenjiang Gas2X400MW2'' 300lb CF82020/3/254
Shandong Power Construction Tiejun Power Engineering Co., Ltd.Pakistan lucky 1X660MW coal-fired power station project3'' 600LB WCB 6'' 600LB WCB 2020/3/176
China Power Engineering Consulting Group East China Electric Power Design Institute Co., Ltd. Longquanshan Domestic Waste Incineration Power Generation PPP Project Engineering Construction General Contracting (EPC) Project4'' 300LB WCB 2'' 150LB CF8 1.5'' 300LB A105 1.5'' 150LB A105 0.5'' 150LB A1052020/2/2455
Inner Mongolia Huineng Coal Chemical Co., Ltd.Coal-to-Natural Gas Project Phase II Project Synthesis and Liquefaction Plant4'' 900LB CF8 2'' 600LB WCB 1.5'' 600LB WCB 2'' 150LB CF32020/2/179
MCC Southern Metropolis Environmental Engineering Technology Co., Ltd.Relocation Project of Heze Jinjiang Environmental Energy Co., Ltd.5'' 150lb WCB 2'' 150lb WCB 2'' 600lb WCB 3'' 300lb WCB 2.5'' 300LB WCB 2'' 150LB WCB 0.75'' 150LB CF82020/2/119
Inner Mongolia Huineng Coal Chemical Co., Ltd.Coal-to-Natural Gas Project Phase II Project2'' 300LB WCB 2'' 600LB WCB 2'' 600LB WCB 2'' 150LB WCB 4'' 600LB CF8C 6'' 150lb CF32020/1/1453
MCC Southern Metropolis Environmental Engineering Technology Co., Ltd.Indonesia Weidabei Industrial Park Co., Ltd. 5# Thermal Power Construction Project8'' 300lb WCB 4'' 150LB CF8 6'' 300LB WCB 6'' 900LB WCB 2'' 300LB WCB 12'' 300LB WCB2019/12/2718
Fujian Hongshan Thermal Power Co., Ltd.2X600MW supercritical condensing heating generator set2.5''6'' 8'' 12'' 150LB 300lb 600lb WC9 WCB2019/12/98
Qingdao Jieneng High-tech Co., Ltd.Rizhao Kaidi Project3'' 150lb WCB2019/11/131
MCC Southern Metropolis Environmental Engineering Technology Co., Ltd.1x250MW Thermal Power Generation Construction Project of Libai Metal Co., Ltd. in Wadabe Industrial Park, Indonesia8'' 300LB WCB 4'' 150LB CF8 6'' 300LB WCB 6'' 900LB WCB 2'' 300LB WCB 12'' 300LB WCB2019/11/1218
Shandong Material Distribution Center of Guodian Materials Group Co., Ltd.Procurement of cold re-supply auxiliary steam control valve, etc. of National Energy Feixian Power Generation Co., Ltd.12'' 600LB WCB2019/11/71
China Energy Construction Group Tianjin Electric Power Construction Co., Ltd.Serbia Pančevo Gas Combined Cycle Power Plant Project6" 4" 3" 150LB 300LB WCB CF82019/10/86
Nantong Wanda Boiler Co., Ltd.Auxiliary machine factory supporting0.75" 2500LB A1052019/8/234
Xuzhou Huakai Heating Co., Ltd.Heating companyDN200 PN16 流量 50-125t/h2019/8/74
Hangzhou Hangguo Industrial Boiler Co., Ltd.Indonesia Gulong Lajapas Steel Company ProjectDN20 DN50 DN 80 PN20 WCB A1052019/8/55
MCC Southern Metropolis Environmental Engineering Technology Co., Ltd.Morovali Power Co., Ltd. (MPM) 1*250MW Thermal Power Construction Project8" 4" 6" 2" 12" 150LB 300LB 900LB WCB CF82019/7/2518
MCC Southern Metropolis Environmental Engineering Technology Co., Ltd.3*250MW Thermal Power Generation Construction Project Group in Indonesia's Widaba Industrial Park8" 4" 6" 2" 12" 150LB 300LB 900LB WCB CF82019/7/2555
Nantong Wanda Boiler Co., Ltd.Auxiliary machine factory supporting0.75" 4" 1.5" 600LB WCB2019/7/1624
Hangzhou Hangguo Industrial Boiler Co., Ltd.Pingluo Sunshine Coking Co., Ltd. coke oven upgrading project waste gas comprehensive utilization power generation projectDN65 DN100 DN25 DN20 PN50 PN260 WCB A1052019/7/157
Hangzhou Hangguo Industrial Boiler Co., Ltd.Chayouqianqi Tengfei Ferroalloy Co., Ltd. 3*30000KVA silico-manganese alloy electric furnace tail gas utilization power generation projectDN40 DN100 DN80 DN65 DN20 PN16 PN25 PN260 CF8 WCB A1052019/7/157
Shenhua Guohua Guangtou (Liuzhou) Power Generation Co., Ltd.2×300MW class unitDN80 4.0Mpa 560℃ CF82019/7/32
Hangzhou Boiler Group Co., Ltd.Greek small projects1" 1/2" 150LB 600LB WCB2019/6/184
Ordos City Ordos Shuangxin Electric Power Co., Ltd.2×1.25万KW1.5" 1500LB A1052019/6/132
Ordos Beijiao Thermal Power Co., Ltd.4×330MW6" 300LB 600LB WCB2019/6/112
MCC Southern Metropolis Environmental Engineering Technology Co., Ltd.Indonesia Dexin Steel Co., Ltd. with an annual output of 3.5 million tons of steel construction project 2*100MW gas generator set1.5" 2.5" 6" 150LB 300LB CF8 WCB2019/6/610
Nanjing Steam Turbine Motor Group Taixing Ningxing Machinery Co., Ltd.Jimin Trusted Project4" 600LB WCB2019/4/96
Shanghai Dingxin Investment (Group) Co., Ltd.Technical Transformation of 2*350MW Domestic Control Valve in Qingshan, Indonesia2" 300LB WCB2019/4/84
Hunan Huadian Changsha Electric Co., Ltd.2×600MWDN100 DN150 PN162019/3/224
Tianjin Military Electric Thermal Power Co., Ltd.40MW1.5" 150LB CF82019/3/182
Shanghai Dingxin Investment (Group) Co., Ltd.Technical Transformation of 2*350MW Domestic Control Valve in Qingshan, Indonesia6" 8" 600LB 300LB WCB2019/2/206
Zhangjiagang Huaxing Electric Power Co., Ltd.Phase II Expansion of Gas Turbine Cogeneration Project6" 1" 4" 2" 2.5" 3" 1.5" 150LB 300LB CF8 WCB A1052019/2/1125
Fujian Hongshan Thermal Power Co., Ltd.2X600MW supercritical condensing heating generator setPN10Mpa flow: 215t/h PN1.6Mpa flow: 160t/h2018/12/136
Waste Incineration Power Plant Project in Shuyang County, Jiangsu Provincesecond phase4" 2" 150LB WCB2018/11/262
Huadian Yangzhou Power Generation Co., Ltd.2X330MW coal-fired generator set1.25" 300LB WCB2018/11/192
Qinghai Haixizhou Multi-energy Complementary Integration Optimization Demonstration Project50MW Tower Molten Salt Solar Thermal Power Plant Project1.5" 2" 3" 4" 6" 150lb 300lb 600lb WCB2018/10/2327
Nanjing Banqiao Power PlantModification of Ammonia Injection Control Valve1" 150LB CF82018/10/182
Guizhou Xingyi Power Plant4×600MW coal-fired generator set8" 150LB WCB2018/10/152
GCL Xinjiang Zhundong Photovoltaic ParkSupporting energy supply project12" 4" 2.5" 1.5" 2" 150lb 300lb 600lb 2018/10/89
CLP New Energy Fengtai CountyAgriculture and Forestry Biomass Power Generation Project2.5" 4" 150lb WCB2018/9/286
Shanghai Electric Power Station Equipment Co., Ltd.Silet Project in Bangladesh2" 600LB WCB2018/9/264
Shenhua Zhuneng Gangue Power Plant2×330MW unit4" 6" 600lb 300lb 900lb WCB2018/9/1712
Institute of Engineering Thermophysics, Chinese Academy of SciencesGezhouba10" 4" 900LB CF82018/9/112
Xuzhou Huakai Heating Co., Ltd.Heating company4" 6" 300lb WCB2018/9/63
Shenwan Anqing Power Plant2×320MW unit1.5" 2" 300LB WCB2018/9/610
Shenhua Guohuahui Power Phase IHeating condensate recovery project3" 600LB WCB2018/9/62
Guodian Taizhou Power Plant Phase II Project2*1000MW ultra-supercritical secondary reheat coal-fired unit4" 300lb CF82018/8/272
Yingshang Wanneng Environmental Power Co., Ltd.Yingshang County Domestic Waste Incineration Power Generation Project0.75" 1" 2" 2.5" 6" 150LB 300LB WCB2018/8/1642
Xuzhou Huakai Heating Co., Ltd.Heating company3" 300lb WCB2018/8/84
Huadian Ningxia Lingwu Power Generation Co., Ltd.1060MW8" 12" 6" 3" 10" 150lb 300lb WCB2018/7/419
Green hills of indonesia2*350MW domestic control valve8" 6" 2.5" 10" 300lb 150lb 600lb WCB2018/7/220
China Resources Power Hunan Co., Ltd.660MW8" 12" 4" 300lb WCB2018/6/206
China Resources Power (Changzhou) Co., Ltd.300MW6" 2.5" 150 CF8 WCB2018/6/43
Inner Mongolia HuinengCoal-to-natural gas project2"300LB CF8 6” 300LB CF82018/5/252
Huaneng Chaohu Power Plant2×600MW supercritical coal-fired unit3" 300LB CF8 3" 300LB CF82018/4/242
China Resources Power Hunan Co., Ltd.2×600MW12" 300LB  WCB 8" 300LB WCB2018/4/196
Supporting energy supply project for Xinjiang Zhundong Photovoltaic Park220T/h pulverized coal boiler2" 300LB WCB 4" 150LB WCB 8" 150LB WCB2018/4/1834
Hebei Tangshan Songting Project3×20 tons converter3" 600LB WCB 4" 300LB WCB2018/4/94
Siraj Ganj Project, Bangladesh1×413.792MW(Gas)2.5" 4" 16" 2"1.5" 300LB 150LB2018/3/229
Shenhua (Fuzhou) Luoyuan Bay Port Electric Co., Ltd.2×1000MW1.5'' 150LB CF8 8'' 150LB CF8 14'' 150LB WCB 8'' 300LB WC92018/3/144
Shenhua (Fuzhou) Luoyuan Bay Port Electric Co., Ltd.2×1000MW1.5'' 150LB CF8 14'' 150LB WCB 8'' 300LB WC92018/3/143
Zhongshan Thermal Power Co., Ltd.60MW coal-fired steam turbine generator set4" 6" 600LB WC92018/3/63
China Resources Power Tangshan Fengrun Co., Ltd.2×350MW supercritical heating unit4'' 600LB WCB2018/3/14
Xinjiang Shenhuo Coal and Electricity Co., Ltd.4×350MW4" 150LB WCB2018/1/54