BACK
Cases
LIST

Minimum flow valve performance table

Date:2021-01-05 Visits:1234
UserUnit ParametersValve SpecificationsTimeQuantity
Nantong Tianshenggang Power Generation Co., Ltd.550MW4'' 2500lb A1052020/7/292
Shenneng Anhui Pingshan Power PlantThe second phase of the project (1X1350MW) coal-fired thermal power generating unit12'' 4500LB WB362020/6/191
National Energy Group Shanxi Shentou Second Power Plant Co., Ltd.2*500MW unit4'' 2500lb A1052020/4/202
National Energy Group Shanxi Shentou Second Power Plant Co., Ltd.2*500MW unit4'' 2500lb A1052020/4/202
Huadian Shaoguan Pingshi Power Plant2X300MW unit4'' 2500lb A1052020/3/21
Huaneng International Power Co., Ltd. Nanjing Power Plant2*300MW unit4'' 2500LB WB362019/12/51
Tengzhou Fuyuan Low Calorific Value Fuel Thermal Power Co., Ltd.2×350MW2'' 1500lb A1052019/9/232
Funeng (Guizhou) Power Generation Co., Ltd.2×660MW unitDN200 PN4202019/7/21
 Shaanxi Huadian Yaochi Power Generation Co., Ltd.2X200MW4'' 2500LB A1052019/6/262
Anhui Huadian Lu'an Power Plant Co., Ltd.2X660MW6" 2500lb A1052019/5/162
Jiangsu Nantong Power Generation Co., Ltd.2×1000MW unit6" 3000lb WB362019/2/282
Huadian Shaoguan Pingshi Power Plant B Plant2*300MW unit4" 2500lb A1052018/9/271
Jiangsu Nantong Power Generation Co., Ltd.2×1000MW unit6" 3000lb WB362018/7/202
Huadian Shaoguan Pingshi Power Plant2×300MW unit4" 2500LB A1052018/5/101
Guodian Suzhou Power Plant350MW unit6" 2500lb A1052018/3/261
Huadian Yaochi Power Plant 200MW unit4" 2500LB A1052018/3/212
Guodian Zhumadian Power Plant330MW unit4" 2500lb WB362018/3/132
Huadian Lingwu Power Plant1060MW unit6" 2700LB WB362018/2/12